Artificial Grass Services

Playground Grass™ Apex
1395 sq ftThe Challenge
An elementary school in Carmel, Indiana needed a lasting fix for a courtyard play area that had grown difficult to use across the seasons. The prior surface turned muddy after rainfall and developed uneven wear patterns and low spots that raised injury concerns during recess and structured activity. Because the space wraps around a modern school building and sits beside a colorful play structure with slides, staff wanted the surface refresh to blend cleanly with the existing footprint rather than force a rework of the equipment or the adjacent rubber mulch zones. Administrators were also weighing the recurring cost of repairs, reseeding, and drying time against a stricter safety standard for the daily rhythm of an educational facility in central Indiana.
Our Solution
ForeverLawn® Indy installed 1,395 square feet of playground turf, a professional-grade artificial grass for playgrounds system engineered for high-impact use in school environments. The team began with base preparation shaped to Indiana’s freeze-thaw cycle and heavy summer storms, then set the surface tight around the existing playground equipment so children could return to the same slides and play structure without any relocation work. Seams were finished to sit flush against the adjacent rubber mulch zone, keeping the transitions clean where the two surface types meet inside the courtyard. Materials were chosen for shock absorption suited to the ages and activity levels using the space, and the vertical drainage profile is built to move water through the system quickly so the courtyard is usable again shortly after a storm passes.
The Results
The finished courtyard gives the school a consistent, cushioned play surface that stays even across the school year and reads as an intentional part of the building’s exterior. Children now have a stable footing zone around the play structure and slides that resists the ruts, puddling, and mud tracking that plagued the earlier surface. School staff have stepped away from the cycle of patching, reseeding, and drying-time closures that the prior surface required, which frees the grounds routine for other work and keeps the play area open on days that would previously have been lost. Administrators and parents report increased confidence in the safety profile of the space, particularly during the wet spring and fall months when the previous surface was at its worst. The Carmel install now serves as a working reference of how a modest 1,395-square-foot courtyard footprint can be upgraded without disturbing existing playground equipment or the surrounding rubber mulch zones.









